Tijuana · Baja California
Northbound San Ysidro 80 min Ready 70 min SENTRI 30 min Otay Mesa 90 min Ready 90 min SENTRI 20 min CBP estimate, 9:00 am Crossing details CBP
Home / Blvd. Insurgentes lane closures by Parque Morelos for about ten weeks as CESPT repairs a sewer main
City update · November 22, 2026

Blvd. Insurgentes lane closures by Parque Morelos for about ten weeks as CESPT repairs a sewer main

Drivers on Bulevar Insurgentes have two work zones to deal with: the Comisión Estatal de Servicios Públicos de Tijuana (CESPT), the state-run water and sewer utility, is rehabilitating the Colector Insurgentes, a sewer collector, at two points on the boulevard, Punto Norte reported on Saturday, Nov. 21, citing CESPT.

By Parque Morelos

From the Paseo del Lago ramp to the climb up to Calzada CETYS, traffic moved on Saturday to the north side of the boulevard, the side away from the park, and will stay there for about ten weeks, according to the report; by our count, that runs into late January. That side now carries traffic in both directions: two lanes from south to north, heading from El Florido toward the city center, and one lane from north to south, toward El Florido.

Between Calle Seminario and Blvd. Simón Bolívar

In the second zone, the south side is closed entirely, so both directions share the north side: two lanes heading south to north and one heading north to south. The report didn’t say how long this stretch will be affected.

Before you go

CESPT’s advice: allow for the changes, watch for the signs or use another route. The report didn’t name specific detours or say whether access to Parque Morelos changes. If you’re driving to the park (our profile) for a weekend outing or an event, leave extra time. For what’s on around the city, see the calendar.